Fast repair on critical Glass-Lined Equipment
Documentation
This case study shows how De Dietrich Process Systems can perform quickly an essential repair on high priority equipment.
CHALLENGES
After many years of operation and despite this severe internal corrosion, the glass-lined surface inside the reactor looks still very shiny and is still of high quality.
Due to his obvious production constraints, the customer asked De Dietrich Process Systems to perform this repair within three weeks.
Welding operations outside a glass-lined vessel is always challenging and therefore requires high degree of experience and expertise.
To discover the solution we have supplied, download the complete Case Study.
Documentation