R&D Pilot Plant Upgrade
Documentation
This case study shows how De Dietrich Process Systems performed an upgrade on a R&D pilot plant,
but also how we managed the complete installation and organization in order to respect the shutdown period.
CHALLENGES
The main issue was finding a way to minimize the amount of time that the facility would be shut down during the construction of the upgraded processing area.
The design challenge for this project was to fulfill all aspects of cGMP and maintain optimum functionality while fitting the skid into an extremely limited envelope of available space.
It was also important to the client to maintain good ergonomics for both operation and maintenance activities.
Finally, the client wanted all four skids to be identical in every way in order to simplify personnel training, subsequent operation and maintenance, and reduce spare parts inventory.
To discover the solution we have supplied, download the complete Case Study.