Relocation of 4 glass-lined vessels from Switzerland to Finland
Documentation
This case study shows how De Dietrich Process Systems managed to move 4 used glass-lined vessels
(2 vertical storage tanks 16m3, 1 vertical storage tank 25m3 and 1 AE250 reactor) as a single contractor.
The project, carried out over a 1 week timeframe, included roof opening and closing, as well as lifting operations and transportation.
CHALLENGES
This project had to be organized in a very short period. Indeed, between the availability of the building and the restitution to its owner, we had only 5 days to complete the relocation. During this time it was necessary to open the roof, disconnect the vessels, disassemble them, take them out of the building and close the roof.
To discover the solution we have supplied, download the complete Case Study.