29 June 2020
Donwload the complete Case Study
This case study shows how De Dietrich Process Systems managed to move 4 used glass-lined vessels (2 vertical storage tanks 16m3, 1 vertical storage tank 25m3 and 1 AE250 reactor) as a single contractor.
The project, carried out over a 1 week timeframe, included roof opening and closing, as well as lifting operations and transportation.